Customer Order "Main Hydraulics Supply" - An example for OUR STRENGTH

The project "Central Hydraulics", which we are currently implementing for a large automotive supplier, is a prime example of our credo "HYDRAULICS + ELECTRONICS = OUR STRENGTH".

Due to our competences in hydraulics and electronics as well as our broad value-added spectrum (engineering->manufacturing->assembly->commissioning) in both areas, we also offer such large-scale plants from one source.

In this project also our "Pregler Save Energy - Concept" is used, with which the used motor-pump-units are operated very energy efficient.

Project schedule:

  • Dec 2021: Order intake
  • Jan to July 2022: Engineering, manufacturing incl. 1:1 assembly of the hydraulic power units on site at our company in Deggendorf. Subsequent disassembly and transport to the end customer.
  • Aug + Sep 2022: Assembly on site at the customer, commissioning, training, trial operation and acceptance.

Highlights:

  • Application of the Pregler Save Energy concept for energy-efficient operation of the motor-pump units.
  • HY unit with approx. 8,000 liters (tank optimized for good air separation)
  • 4 pcs. 132kW high pressure motor-pump units with 250l/min each at 280 bar (prepared for expansion stage to 1,250 l/min at 280 bar)
  • Electrical control system with intelligent automation, Safety Integrated, Power Management and Drives Control
  • Electrical control system with intelligent automation, Safety Integrated, Power Management and Drives Control
  • Power supply: 3x 630 A
  • Main switch: 1600A, selective power distribution